| | Date of Work | Work Request | Status |
|
| 8/15/2010 | Clean gutters annually | Pending |
|
| 8/2/2010 | Install gutter and downspout on east side of church. | Started |
|
| 7/12/2010 | Paint S wall of CTK office; paint closet off upper sanctuary; check roof leak; clean gutters; clean out area behind altar screen | Completed |
|
| 7/12/2010 | Replace AA sized batteries in all CTK clocks | Completed |
|
| 7/12/2010 | Replace threshold at main CTK entrance | Completed |
|
| 7/5/2010 | Clean up paint spill behind altar screen. Spackle holes in S wall of CTK office. | Completed |
|
| 6/28/2010 | Move CAT5 wire from former Sr. Pr. office to Sacristy Storage room to enable networking of carillon computer. | Completed |
|
| 6/14/2010 | Replace all air handler/furnace filters lubricate bearings 6 Month service | Pending |
|
| 5/17/2010 | Lube furnace blower; set up choir loft for handbells; replace piece of ceramic tile in ladies' room, check for clogged ladies' toilet near P&G room; hang banner in upper sanctuary. | Completed |
|
| 5/10/2010 | Met with Mar Lighting about Great Hall and other lights. Replaced light bulbs in church and Pr. office. Repaired small AGC table. Set out garden hoses for the season. | Completed |
|
| 5/3/2010 | Tear off and replace roof on CTK garage | Pending |
|
| 4/5/2010 | Installed new garbage disposal in Trinity House. | Completed |
|
| 3/29/2010 | Setup Great Hall for Easter breakfast. Setup choir loft for choir. | Completed |
|
| 3/22/2010 | Remove old desks from former CTK office (Altar Guild room), move old carillon to CTK garage for pickup by new owner. Set up for handbell choir. Set up Great Hall for Maundy Thursday dinner. | Completed |
|
| 3/5/2010 | Install riser under sound receiver/amplifier and install fluorescent light in sound booth. | Completed |
|
| 3/1/2010 | Repair office desk drawer A.G.C. office | Completed |
|
| 2/25/2010 | Modifiy built in cabinets/counters in Sacristy | Pending |
|
| 1/25/2010 | Repair or replace toilet in upstairs ladies room | Completed |
|
| 1/25/2010 | Replace light bulbs in AGC 4's room. Lube microphone support at pulpit. Try using plumber's snake to clear women's toilet. Restore chair arrangement and put away tables in upper sanctuary. | Completed |
|
| 1/18/2010 | Replace all air handler/furnace filters lubricate bearings 6 Month service | Completed |
|
| 1/11/2010 | Erect shelves in attached garage at Trinity House. Clean out unneeded junk. | Completed |
|
| 1/4/2010 | Take down Christmas trees in altar area and Great Hall. Take down poinsettia tree. Disassemble manger scene. Move all to Trinity House garage. Replace ballast, AGC common area. Unplug women's toilet #2 again. | Completed |
|
| 12/28/2009 | Replace recirculting pump on furnace near AGC area. Put away excess chairs and tables from Christmas services. Use large CFL bulb adaptor and extension pole to change light bulb in Great Hall without a lift! | Completed |
|
| 12/21/2009 | Set up tables for bell choir. Unstop #2 toilet in women's room near Great Hall. | Completed |
|
| 12/14/2009 | Set up for poinsettia tree near altar. Remove bell tables from choir loft, replace with choir chairs. Replace light bulbs in upper sanctuary. Determine cause of noisy pump motor in furnace room near AGC. | Completed |
|
| 12/8/2009 | Remove chairs and set up bell tables in choir loft. Attach silhouettes of manger scene near CTK front door. Replace light bulbs in women's restroom near Great Hall. | Completed |
|
| 11/30/2009 | Set up Christmas tree with lights near altar. Set up manger scene in front of church. Swap desk in front of church office with desk in Sr. Pastor's office. | Completed |
|
| 11/23/2009 | Replace light bulbs in AGC Rm 212. Rearrange chairs and tables in Great Hall. Complete work on outlet at CTK sign. Bring Christmas decorations from Trinity House to CTK for assembly next week. | Completed |
|
| 11/16/2009 | Install electrical outlet at CTK sign base. Remove tables from choir loft, set up chairs. Set up tables in Great Hall. Patch paint in Sr. Pastor's office | Completed |
|
| 11/9/2009 | Mount more book shelves on walls, Sr. Pastor's office | Completed |
|
| 10/26/2009 | Hang two cork poster strips in AGC Rm 215. Replace ballast and bulbs in one fixture in AGC open area. Move small refrigerator from Trinity House to AGC Rm 213. Repaire toilet in Women’s Room, main floor, new building. | Completed |
|
| 10/19/2009 | Remove shelves from former Sr. Pastor office, attach them to wall in new Sr. Pastor’s Office. | Completed |
|
| 10/17/2009 | Rent lift, replace all parking lot lights. Replace ballast in SW parking lot light fixture. | Completed |
|
| 10/12/2009 | Carry 30+ quilt boxes upstairs. | Completed |
|
| 10/5/2009 | Check and/or adjust exterior door insulation strips. Need to replace strips at Crying Room door and at AGC entrance. | Pending |
|
| 9/6/2009 | Finish replacing bulbs in Great Hall, then return lift. | Completed |
|
| 9/5/2009 | Rent lift, re-aim sermon lights in sanctuary. Replace light bulbs in Great Hall with new fluorescent bulbs. Some re-engineering required. | Completed |
|
| 8/10/2009 | Perform maintenance of building exhaust fans - greased but not oiled | Started |
|
| | Please paint the walls in classroom 106 | Pending |
|
| | Install fire alarm system for entire church | Completed |